Digging the pond and hard structure placement

Spent the week digging the pond and pump house.

I started by marking out the shape and placement of the pond. I then worked on CADD to design the 3D version of what the ground work, pumping and plumbing would look like. The dig time took about a week and then getting the plumbing dialed in with the pumps took another week. Next was water… it took about 3 days to fill the pond (while monitoring it). Three weeks later the water had settled out, warmed up and was ready for the first grouping of fish to return home from my good buddy Dave’s house.

Dave had graciously watched our fish while we moved and built our home. They couldn’t have been in better hands.

Check out the build pics!

20190526_194225.jpg
20190527_212437.jpg
20190529_120813.jpg
30159.jpeg
30197.jpeg
30629.jpeg
30182.jpeg
30198.jpeg
30163.jpeg
30178.jpeg
30181.jpeg
30154.jpeg
30623.jpeg
30621.jpeg
30624.jpeg
30631.jpeg
20190715_113516.jpg
20190810_204111.jpg
20190810_204120.jpg
20190823_095033.jpg
20190825_191435.jpg
20190825_191447.jpg
20190914_193229.jpg
32403.jpeg
32341.jpeg
32411.jpeg
32401.jpeg
Jon White